The rains have not kept our builder away! We just haven't posted for quite a while. The house now is completely sided, and has all sheetrock done, and most wood trim and cabinets in place. We must next decide on a wood stain color - pretty important to not get the wrong shade since all the wood trim and cabinets will be the same color.
The rain HAS delayed any pouring of the driveway or sidewalks so the entrance is still a muddy challenge.
Tuesday, August 3, 2010
Tuesday, June 29, 2010
June 28
We haven't done a post for awhile, but not because of no progress! The house is framed, roof is on, windows and doors in, and the siding was started today. Lots of progress! Our crews have managed to work around all the June rain. Inside, the framing is done, A/C HVAC crews have installed the furnace and ductwork, and markings are done for electrical outlets, TV and phone.
We like the spaciousness of the great room and master suite, and are glad we could still have large windows to the back of the house (W/SW).
Tuesday, June 15, 2010
June 14 2010
Wednesday, June 9, 2010
June 9
City inspectors approved the plumbing connections. Basement floor concrete was poured and garage floor was poured.