Tuesday, August 3, 2010

August 3

The rains have not kept our builder away! We just haven't posted for quite a while. The house now is completely sided, and has all sheetrock done, and most wood trim and cabinets in place. We must next decide on a wood stain color - pretty important to not get the wrong shade since all the wood trim and cabinets will be the same color.

The rain HAS delayed any pouring of the driveway or sidewalks so the entrance is still a muddy challenge.

Tuesday, June 29, 2010

June 28


We haven't done a post for awhile, but not because of no progress! The house is framed, roof is on, windows and doors in, and the siding was started today. Lots of progress! Our crews have managed to work around all the June rain. Inside, the framing is done, A/C HVAC crews have installed the furnace and ductwork, and markings are done for electrical outlets, TV and phone.

We like the spaciousness of the great room and master suite, and are glad we could still have large windows to the back of the house (W/SW).

Tuesday, June 15, 2010

June 14 2010


Subflooring and wall joists are being installed today (I think joist is the right word...!) The lumber crew is really working along, despite REALLY muddy ground surrounding the house.

Wednesday, June 9, 2010

June 9

City inspectors approved the plumbing connections. Basement floor concrete was poured and garage floor was poured.

May 27


The foundation was poured today.

May 25

Footings were poured today for the foundation walls and additional load-bearing wall.
May 24 - "The hole" was dug today! I guess that marks the official start of construction! We hope for lots of sunny days in the coming months.